Before the Roof Replacement
The existing roof on Bobby and Alene's New Haven home shows signs of aging, including dark algae streaks and worn three-tab shingles. Follow along to see how Brown Roofing transforms this exterior with a complete roof replacement!
Mismatched Roofing Materials
An elevated view reveals the different shingle colors previously installed on the home, with gray shingles on the front and side sections and lighter brown shingles toward the rear. Replacing the roofing materials throughout the home will create a more consistent, coordinated appearance.
Existing Chimney Condition
A closer look reveals the existing chimney covered in a thick, silver-colored coating, including around its connection to the roof. As part of this project, our crew will rebuild the chimney from the roofline up, giving it a completely new appearance.
Worn Shingles and Roof Penetration
This close-up shows deteriorated shingles surrounding an existing roof pipe penetration. The roof replacement will include updated roofing materials and new flashing around the pipe to help protect this vulnerable area.
Beginning the Roof Tear-Off
Our crew begins removing the old shingles while protective tarps are positioned around the home. These tarps help collect debris and protect the surrounding property during the removal process.
Inspecting Tongue-and-Groove Decking
Beneath the old shingles, the roof features tongue-and-groove decking, a system of wooden boards that interlock along their edges to form a continuous surface. Some areas show visible deterioration, highlighting the importance of evaluating the underlying structure during a roof replacement.
Installing a New Plywood Layer
Our crew installs CDX plywood sheets over the existing tongue-and-groove roof decking to create a solid, uniform surface for the new roofing system. This additional layer provides a suitable foundation for the installation of modern roofing materials.
Completed CDX Plywood Overlay
The new CDX plywood layer is fully installed across the roof, creating a clean and consistent decking surface. With this preparation complete, the crew can move forward with the protective layers of the roofing system.
Sealing Seams and Protecting the Eaves
Our crew tapes the seams between plywood sheets and installs ice and water shield extending six feet up from the eaves. These protective measures help reduce the risk of moisture intrusion, particularly in areas vulnerable to ice dams and wind-driven rain.
Protecting the Narrow Roof Sections
The narrow roof sections along the sides of the home, sometimes called rabbit runs, receive complete ice and water shield coverage. This additional waterproofing helps protect these smaller, vulnerable roof areas.
Installing VELORA ONE Underlayment
VELORA ONE synthetic underlayment is installed over the remaining exposed roof decking. This protective layer sits beneath the shingles and provides an additional barrier against moisture.
Preparing for New Shingles
White drip edge and rake metal are installed along the roof's perimeter to help manage water runoff and protect the roof edges. Bundles of IKO Dynasty shingles are positioned along the roof in preparation for installation.
Roofing the Rear Entryway
The small roof above the rear entryway receives the same careful preparation and protective roofing materials as the main roof. Addressing every section helps create a consistent roofing system throughout the home.
Installing Monaco Red Shingles
Our crew installs IKO Dynasty architectural shingles in the distinctive color Monaco Red. The rich red shade pairs beautifully with the home's white siding and red shutters, creating a bold, coordinated exterior.
Completed Side Roof Section
This narrow side roof section is now finished with new IKO Dynasty shingles in Monaco Red. Both side sections receive matching materials for a consistent appearance across the home.
Installing Ridge Ventilation
A ridge vent is installed along the roof's peak to allow warm, humid attic air to escape as part of a properly balanced ventilation system. Matching ridge cap shingles are then installed over the vent to complete the roofline.
Updated Pipe Flashing
New flashing is installed around the roof's pipe penetration to help prevent water from entering where the pipe passes through the roofing system. This finishing detail helps maintain a watertight seal around the opening.
Installing the SBS Base Layer
The flat roof above the front entryway receives the base layer of a new SBS modified bitumen roofing system. This material is designed for low-slope and flat roof applications where conventional shingles are not appropriate.
Completed Red SBS Roofing
The front entryway roof is finished with a red SBS modified bitumen cap sheet that complements the Monaco Red shingles on the main roof. This coordinated finish provides a cohesive appearance while protecting the low-slope roof section.
Completed Roof Replacement
The finished roof showcases IKO Dynasty architectural shingles in Monaco Red, giving Bobby and Alene's home a vibrant new appearance. The matching red roofing accents beautifully complement the home's white siding and red shutters.
Rebuilding the Chimney
With the new roofing materials installed, masonry work begins on the chimney, which is being rebuilt from the roofline up. The deteriorated, heavily coated structure is removed and new brickwork takes shape.
Completed Brick Chimney
The newly rebuilt chimney features clean, traditional red brickwork, replacing the previously coated structure. This finishing improvement complements the new Monaco Red roof and completes the home's exterior transformation.