Before the Roof Replacement
Before work began, John's roof showed signs of aging, including visible dark streaking across the existing shingles. Brown Roofing was brought in to replace the roof and help the homeowner meet his insurance requirements.
Deteriorating Chimney Flashing
A closer inspection revealed aging chimney flashing with visible discoloration and sections beginning to lift. Properly maintained flashing is essential for protecting the vulnerable area where the chimney meets the roof.
Roof Tear-Off and Decking Inspection
With the old roofing materials nearly removed, our crew exposed the home's existing tongue-and-groove roof decking for inspection. This traditional construction method uses interlocking wooden planks to create a continuous surface beneath the roofing system.
Removing Damaged Roof Decking
During the decking inspection, our crew identified wooden planks that needed replacement and removed the compromised sections. Addressing damaged decking provides a sound foundation for the new roofing materials.
Installing New CDX Plywood
New CDX plywood was carefully measured, cut, and installed in the areas where damaged planks had been removed. These repairs restored the affected sections of the roof deck before installation of the protective roofing layers.
Applying Ice and Water Shield
Our crew installed ice and water shield along the roof's eaves to provide additional protection against moisture intrusion. This self-adhering membrane helps safeguard vulnerable areas from wind-driven rain and ice dams.
Installing VELORA ONE Underlayment
VELORA ONE synthetic underlayment was installed across the remaining roof surface to create an additional protective barrier beneath the shingles. The existing tongue-and-groove decking did not require the same panel-seam taping typically used on plywood or OSB roof decks.
Preparing for Shingle Installation
With the drip edge and rake metal installed, bundles of new shingles were staged on the roof in preparation for installation. These metal edge components help direct water away from the roof's perimeter and protect exposed decking edges.
Installing IKO Cambridge Shingles
Our crew began installing IKO Cambridge architectural shingles in the color Harvard Slate, giving the home a refreshed appearance. These dimensional asphalt shingles provide an attractive finish while serving as the primary weather-resistant layer of the roofing system.
Preparing the Skylight Opening
The existing skylight was removed, leaving the roof opening exposed in preparation for its replacement. Our crew prepared the area for the installation of a new skylight as part of the roof replacement project.
Installing the New VELUX Skylight
A new VELUX skylight was installed to replace the home's previous unit. Integrating the new skylight with the roofing system helps maintain a weather-resistant seal around the opening while allowing natural light into the home.
Completed Rear Roof and Skylight
The finished rear roof features new IKO Cambridge shingles in Harvard Slate, a newly installed VELUX skylight, and three replaced pipe boots. These improvements provide a clean, finished appearance while protecting several important roof penetrations.
Updated Chimney Flashing
The completed chimney flashing provides a significant improvement over the previously deteriorated and discolored materials. Properly installed flashing helps direct water away from the chimney-to-roof intersection and protect against leaks.
Completed Roof Replacement in West Haven
The finished roof gives John's Cape-style home a refreshed appearance with new IKO Cambridge shingles in Harvard Slate. From decking repairs to the new skylight and chimney flashing improvements, Brown Roofing completed a comprehensive roof replacement tailored to the home's needs.