Existing Roof - Before Replacement
This view shows Brent's historic Derby home before the roof replacement began. Originally built in 1884, the house was ready for an updated roofing system after years of wear and previous roofing work.
Granule Loss on Existing Shingles
A closer view of the lower roof reveals significant granule loss across the existing asphalt shingles. This deterioration indicated that the shingles had experienced substantial surface wear.
Existing Skylight and Flashing
The original skylight was surrounded by an extensive arrangement of overlapping roofing membrane and metal flashing. These materials documented the condition of the skylight area before its replacement with a new VELUX unit.
Roof Tear-Off and Property Protection
Our crew began removing the existing roofing materials while using large protective tarps to help safeguard the surrounding property. This preparation helped keep debris contained during the tear-off process.
Existing Sheet Decking Inspection
With the old roofing materials removed from the south-facing upper roof, the existing sheet decking was exposed for inspection. Our crew examined the wood to determine its condition before proceeding with the new roofing system.
Cedar Shake Removal and Skip Sheathing
On the north-facing upper roof, the tear-off revealed existing cedar shakes installed over skip sheathing. The old roofing materials were removed to prepare this section for a solid, continuous decking surface.
New CDX Plywood Over Skip Sheathing
New CDX plywood was installed over the existing skip sheathing on the north-facing roof section. This created a continuous, stable surface suitable for the installation of modern asphalt shingles.
Documenting New Plywood Installation
Each new sheet of CDX plywood was numbered to document the decking installation. This process helped maintain an accurate record of the replacement materials used during the project.
Existing Tongue-and-Groove Decking
The lower roof section featured tongue-and-groove wood decking, a different construction style from the upper roof sections. This project involved three distinct decking configurations across the home's various roof planes.
Taped Decking Seams and Ice and Water Shield
After the decking was prepared, our crew taped the plywood seams and installed ice and water shield along vulnerable areas of the roof. These protective measures helped prepare the surface for the remaining roofing components.
VELORA ONE Underlayment Installation
VELORA ONE synthetic underlayment was installed across the prepared roof, along with new drip edge and rake metal. Bundles of shingles were staged on the roof in preparation for installation.
IKO Dynasty Sentinel Slate Shingles
Our crew began installing IKO Dynasty architectural shingles in Sentinel Slate, a distinctive blend of gray tones with subtle reddish accents. The lower roof section was also prepared for its new shingles, creating a consistent roofing system across the home.
Chimney Flashing Preparation
Work continued around the chimney, where the flashing was being updated at the intersection of the chimney and roof. Proper flashing installation helps direct water away from this vulnerable transition.
Completed Lead Chimney Flashing
New lead flashing was installed and finished around the chimney, with sealant applied at appropriate joints. The completed work provides a clean transition between the masonry chimney and the new shingles.
Finished Lower Roof and New VELUX Skylight
A closer look at the completed lower roof highlights the new Sentinel Slate shingles, neatly finished cap shingles, and a new VELUX skylight. These updated features give the lower roof a clean, cohesive appearance.
Completed Roof Replacement
The finished roof features IKO Dynasty architectural shingles in Sentinel Slate, complementing the home's pale yellow siding and historic character. With updated decking, flashing, and skylight components, Brent's Derby home has a refreshed appearance from top to bottom.