An Aging Roof Ready for Replacement
Here is a look at Sheila's Fairfield home before the roof replacement began. Although the existing shingles appeared relatively intact from a distance, the roof was more than 25 years old and had reached an age where replacement was a practical consideration. A roof's overall condition cannot always be determined by its appearance alone.
Preparing for the Tear-Off
The Brown Roofing crew begins removing the existing roofing materials to make way for the new system. Large protective tarps are positioned around the home to help shield the surrounding property and collect debris during the tear-off. Keeping the work area protected and organized is an important part of the replacement process.
A Bird's-Eye View of the Roof Deck
With the old shingles removed, the underlying plywood decking is exposed for inspection. This aerial view provides a clear look at the roof's structure before the new materials are installed. The crew carefully examines the decking to identify any sections that may need to be repaired or replaced.
Identifying Water-Damaged Decking
A closer look near one of the dormers reveals dark staining on the plywood decking, indicating previous moisture exposure. Areas like this require careful evaluation to determine whether the wood remains suitable to support the new roofing system. Identifying compromised decking during the tear-off allows the crew to address underlying concerns before proceeding.
Replacing Compromised Plywood
After identifying sections of decking that required replacement, the crew installs new CDX plywood to restore a solid foundation for the roof. Each replacement sheet is marked and numbered to help document the work performed. A sound roof deck is essential for properly supporting the layers of protection installed above it.
Installing New Fascia
Here, the crew installs a new section of fascia along the roof's edge. Fascia helps finish and protect the roofline while providing a secure surface for associated trim and gutter components. Replacing deteriorated or damaged wood during a roof renovation helps ensure the finished system has a solid, properly prepared perimeter.
Sealing Seams and Adding Ice and Water Shield
With the decking repairs complete, the crew begins installing the roof's protective layers. Decking seams are taped, and ice and water shield is applied to vulnerable areas for additional protection against moisture intrusion. These materials help create a more resilient roofing system beneath the finished shingles.
Installing Synthetic Underlayment
The crew continues preparing the roof by finishing the installation of synthetic underlayment. This protective layer covers the decking and provides an additional barrier against moisture beneath the shingles. Proper underlayment installation is an essential step in preparing the roof for its new finish.
Installing Drip Edge Along the Dormer
New metal drip edge is installed along the edge of one of the home's dormers. This component helps direct water away from the underlying roof materials and toward the intended drainage path. Properly installed edge metal also contributes to a clean, finished appearance along the roofline.
Ready for the New Shingles
With the protective underlayment and perimeter metal installed, the roof is prepared for shingle installation. Bundles of new shingles have been staged near the ridge, allowing the crew to work efficiently across the roof. The project is now ready for one of its most visually transformative stages.
IKO Dynasty Shingles in Weatherwood
The crew begins installing Sheila's new IKO Dynasty architectural shingles in the color Weatherwood. This shingle selection provides a dimensional appearance while offering durable protection against the elements. As installation progresses, the home's updated roof begins to take shape.
Installing New Chimney Flashing
The crew installs new metal flashing where the chimney meets the roof. Proper chimney flashing is essential for directing water away from this vulnerable transition and helping prevent moisture from entering the roofing system. Careful attention to these details is an important part of a complete roof replacement.
Protecting the Plumbing Vent with a Perma-Boot
A new Perma-Boot is installed over the plumbing vent pipe to provide additional protection at this roof penetration. Designed to cover and protect the existing vent boot, the Perma-Boot helps reduce the risk of leaks caused by deterioration around the pipe. It's a small component that plays an important role in the roof's overall weather resistance.
Installing Ridge Ventilation
The crew installs a ridge vent along the roof's peak to support proper attic ventilation. Ridge vents allow warm, moisture-laden air to escape from the attic when paired with adequate intake ventilation. This helps manage heat and moisture buildup and contributes to the long-term performance of the roofing system.
Finished Flashing and Ridge Details
With the new chimney flashing completed, the crew finishes the roof's uppermost details, including ridge cap shingles over the ridge vent. These finishing components help protect vulnerable transitions while creating a clean, cohesive appearance. Attention to flashing and ridge details is essential to the performance of the completed roof.
A Beautifully Finished Roof in Fairfield
Sheila's roof replacement is complete, featuring IKO Dynasty shingles in Leatherwood and updated protective components throughout the roofing system. From replacing water-damaged decking to installing new flashing, ventilation, and finishing details, the Brown Roofing crew has given this Fairfield home a refreshed roof built for dependable protection. Another successful transformation! Brown Won't Let You Down!