An Aging Roof Ready for an Upgrade
Before beginning their future solar project, David and Janet decided to replace their approximately 20-year-old roofing system. The existing three-tab shingles had reached an age where the homeowners were ready to invest in a complete roofing upgrade.
A Chimney in Need of Attention
The existing chimney flashing had been heavily covered with roofing cement, obscuring much of the transition between the chimney and surrounding shingles. As part of the replacement, this area would be addressed with new, properly integrated metal flashing for a cleaner and more reliable finished detail.
Removing the Existing Roof
The Brown Roofing crew began by protecting the property with large tarps before stripping away the existing shingles. Careful preparation helps contain roofing debris and protect the home and surrounding landscaping throughout the tear-off process.
Replacing Compromised Decking
Once the existing roofing materials were removed, the crew inspected the exposed plywood decking and identified sections that required replacement. Compromised material was removed and replaced with new CDX plywood to restore a solid foundation for the new roofing system.
Preparing the New Decking
The seams between sheets of plywood were taped before ice and water shield was installed along vulnerable areas of the roof. Newly installed CDX sheets were also numbered, helping the team document and keep track of the decking replaced during the project.
Additional Waterproofing Across the Front
At David and Janet's request, the entire front roof deck was covered with self-adhering ice and water shield. Extending this waterproofing membrane beyond the typical vulnerable areas provides an additional layer of moisture protection beneath the finished shingles.
Protecting the Remaining Roof Deck
On the rear roof sections, ice and water shield was installed in vulnerable areas while synthetic underlayment protected the remaining exposed decking. Together, these materials create an important secondary layer of protection beneath the new shingles.
Installing Glacier Shingles
With the roof fully prepared, the crew began installing IKO Dynasty shingles in Glacier. The cool charcoal tones give the home a crisp, dimensional appearance while completing the primary weather-shedding surface of the new roofing system.
A Solution for the Low-Slope Section
One section of the home had a pitch too low for traditional asphalt shingles, requiring a roofing system designed for low-slope applications. The crew began by installing the base layer of an SBS modified bitumen system to provide dependable waterproof protection for this area.
Completing the SBS Roofing System
A finished SBS cap sheet was installed over the prepared base, completing the low-slope roofing system. Its durable surface provides a clean, watertight finish while allowing this section to integrate neatly with the surrounding roof.
New Chimney Flashing
The chimney received new metal flashing to create a clean, properly integrated transition between the masonry and the surrounding roofing system. The finished flashing provides a dramatic improvement over the heavily cemented condition seen before the project began.
Supporting Proper Attic Ventilation
A ridge vent was installed along the roof peak to provide an exit point for warm, humid air from the attic. When paired with adequate intake ventilation, this helps promote continuous airflow through the attic space and supports the performance of the roofing system.
Ready for the Next Chapter
With IKO Dynasty Glacier shingles, new waterproofing materials, updated chimney flashing, ridge ventilation, and an SBS low-slope roofing system in place, David and Janet's roof replacement was complete. Their Middlebury home now has a refreshed roofing system ready to provide dependable protection as they move forward with their plans for solar. Brown Won't Let You Down!