Before: Ready for Replacement
Darwin's inspection helped the homeowner see why replacing the 25+ year old roof was the right step before small age-related concerns became larger problems.
Aging Roof Surface
The older roof had reached the point where age was the homeowner's main concern. A roof this old can lose strength even before major leaks appear.
Property Protection First
Before and during tear-off, tarps are placed around the home to help protect landscaping, walkways, and siding from falling debris.
Full Tear-Off Begins
The crew removes the old roof down to the wood deck so hidden issues can be found before the new roofing system goes on.
Deck Protection Underway
After the old shingles are removed, the roof deck is checked and covered with protective materials to help block wind-driven rain and water intrusion.
Water Barrier Installation
Ice and water protection and underlayment are installed before the shingles, adding an important layer of defense beneath the finished roof.
Shingles Going On
IKO Dynasty Shadow Brown shingles are installed in sections, giving the home a fresh look while rebuilding protection from the roof deck up.
Step-by-Step Installation
Project Manager Hakeem's crew works across the roof in stages, keeping materials organized and making sure each section is properly prepared before shingles are installed.
Finished Roof from Above
From this aerial view, the full roof system shows a consistent shingle pattern, clean lines, and a completed installation across the main house and garage
Completed Front View
he new Shadow Brown roof gives the home a clean, finished appearance while helping protect a home originally built in 1990.