Before the Install
This property awaits it's new Brown Roofing System
Panel Removal
Before Installation the solar panels are removed from the roof.
Property Protection
Our crews use heavy tarps to protect the home and collect roof debris
Shingle Removal Begins
The team tapes off the area and begins "ripping" the roof.
New decking
Deteriorated deck boards are replaced at the edge of the roof.
Front of the House
With the new roof installation in process the decking is secured and taped and ice & water shield installed.
A New Roof Begins
Starter shingles are placed at the roof line then placed in a staggered pattern to prevent water intrusion.
The Pitch Hopper
Our crews use a "Pitch Hopper" to create a flatter, grippier surface so they can kneel, sit, brace their feet, or work more comfortably while installing shingles.
IKO Dynasty Summit Gray
This roof is now fortified and leak free.